The structure of the crusher is simple, and the phenomenon of over-crushing is less. The shape, size, and arrangement of the teeth on the roller surface can be changed according to the nature of the material, and it can crush medium and fine ores of medium-hard and soft ores. However, this crushing plant mainly crushes ores in daily operation, and vibrations will be generated during the operation. A good quality crusher liner not only reduces production wear but also effectively extends the service life of the roll crusher. However, crusher liners are wearing parts, and even the best quality ones cannot withstand long-term use. Crusher liner plate fracture phenomenon, it is timely to replace to reduce the wear and tear of the equipment itself. So, what is the cause of crusher liner fracture? What are the steps to replace the crusher liner? Here are the answers for you respectively.
Here is the content list:
Causes of fracture
Replacement steps
In general, the service life of the crusher is entirely in the hands of the operator. To increase the crushing efficiency, many users let the crusher overload the work, the main machine after a long time of overload work will cause the crusher liner fracture. Some operators do not understand the material feeding standard and let the ore larger than the feeding port into the crushing cavity, which causes the crusher liner to crack. Not leveling or having deflection between the crusher liner and the liner pad can constitute liner cracking.
Perform a power cut at the first opportunity, preferably with the main switch off to prevent the risk of electric shock. After cutting off the power supply, require a conspicuous position on the "under repair" warning sign. Start to replace the crusher liner, first of all, unload the lubrication pump, pull the supply belt rope switch, clean up the belt head pumice, remove and lift the four major parts such as the lower material mouth guard, cauldron, cover plate, and fixed cone dust cover. During the lifting process, the overhead crane needs to be commanded by a person, and strictly abide by the lifting operation procedures. When the old crusher liner cannot be taken down, it can be cut by gas welding, and the inner surface of the frame will be cleaned. The new concrete cast on the back of the crusher liner is made of 500~600 cement and sand, and the ratio is mixed by weight ratio l:3. After the topmost crusher liner is put on, the compression nut should be put on first, and then the zinc alloy is poured. Before casting, the cone and the liner are preheated at 60~80℃, and the gaps of the joints of the crusher liner should be plugged with asbestos and clay so that the zinc alloy will not leak out of the liner. After casting the alloy, the pressing nut and the locking plate are installed to make it fixed tightly. After all the operations are completed, then open the machine through the trial run, after running empty for a period of time, together with normal to add materials to start operations.
Login to www.hytoncrusherparts.com you can learn more about crusher liner plates.